From a failing spindle to a closed, costed repair

A vibration reading on CNC-04 drops the machine’s health score and raises a request. VenturusAI drafts the work order, a planner approves it, the parts kit waits at the storeroom window, and the repair posts its cost to the asset and the ledger.

Maintenance / Work orders / WO-24817

WO-24817 · CNC-04 spindle bearing

Plant 1 · Corrective · High priority

Closed
Health score
91 → 62
Labor
3.5 h
Parts
7014 bearing kit
Posted cost
$1,284.60
StepWhoWhenDetail
Vibration alarmSensorThu 9:12 AMSpindle over limit
Request draftedVenturusAIThu 9:13 AMBearing wear · High
ApprovedM. ChenThu 9:40 AMSlot 2:30 PM, J. Ruiz
Kit stagedStoreroomThu 11:05 AMBin A-14 to window
Repair completeJ. RuizThu 6:00 PMBearing replaced
Cost postedSystemThu 6:02 PM$1,284.60 to CNC-04

VenturusAISuggested work order

  • Bearing wear on the spindle, priority high, craft machine repair.
  • Use the 7014 bearing kit from bin A-14. J. Ruiz is free at 2:30 PM, before second shift.
Accept

Step by step

  1. 01

    The sensor flags the spindle

    Spindle vibration on CNC-04 crosses its limit and raises an alarm. The asset’s health score falls from 91 to 62, and the plant map turns the machine amber.

    Sensor alarms with acknowledge and shelveOut-of-spec readings flagged on arrivalAsset health score with reasonsPlant floor sensor board

  2. 02

    A request is raised on the asset

    The alarm opens a work request on CNC-04 with the reading attached. An operator can add a note or a photo from a phone by scanning the machine’s QR code.

    Condition-based work orders from sensor alarmsMaintenance requests from any signed-in userRequest work by scanning the asset's QR code

  3. 03

    VenturusAI drafts the work order

    VenturusAI reads the request and the asset’s history and suggests bearing wear, high priority, the steps and the 7014 bearing kit. It also suggests J. Ruiz at 2:30 PM, before second shift.

    Suggested priority, codes, craft and steps on work requestsDraft work order from a requestSuggested technician assignments on the schedule board

  4. 04

    The planner approves it

    M. Chen reviews the draft, keeps the suggestions and approves WO-24817. The audit trail records which fields came from VenturusAI and who accepted them.

    Request triage and approvalConvert a request to a work order in one clickAudit trail that separates AI help from human action

  5. 05

    The parts kit is staged at the storeroom window

    The 7014 bearing kit is reserved against the work order and picked from bin A-14. The storeroom stages the parts kit at the window with the work order number on it.

    Parts reservation and availability checkPart kitsStorage location hierarchy

  6. 06

    The technician picks up the kit and makes the repair

    J. Ruiz collects the parts kit at 2:30 PM and works the job from the mobile app, following the lockout steps. He records his hours and issues the kit to the work order.

    Technician mobile appLockout/tagout steps on work ordersLabor entry per operationIssue and return parts against a work order

  7. 07

    Closeout posts the cost to the asset and the ledger

    J. Ruiz closes the job with a failure code and a short summary. $1,284.60 in labor and parts rolls up to CNC-04 and posts to the general ledger.

    Work order closeoutActual cost roll-up at closeoutLabor posts to the general ledgerFailure codes on work orders

Related

Common questions

Does a sensor alarm create a work order automatically?

A condition-based PM can create the work order when a reading crosses its limit. Otherwise the alarm raises a request, and a planner decides whether it becomes work.

What does VenturusAI decide on its own?

Nothing. VenturusAI drafts the priority, failure code, steps, parts and a suggested technician and slot. A planner accepts or edits each suggestion before the work order is released.

How does the technician get the parts?

Parts planned on the work order are reserved and picked into a parts kit, which the storeroom stages at the window. The technician picks up the kit and issues it to the work order from the mobile app.

Where does the repair cost go?

Labor and parts post as they are recorded, and at closeout the actual cost rolls up to the asset. You see it on the asset’s record and in the general ledger.

The plant never stops. Neither does the record.

Bring an asset list and a month of work orders. We will load them and walk through your own plant in VenturusEAM, from the purchase order to the depreciation run.